{"data":{"id":"us-ne/neb.-rev.-stat.-61-516","jurisdiction":"us-ne","citation":"Neb. Rev. Stat. § 61-516","heading":"Neb. Rev. Stat. § 61-516","body":"A design-build contract, a progressive design-build contract, and a construction manager-general contractor contract may be conditioned upon later refinements in scope and price and may permit the department in agreement with the design-builder, progressive design-builder, or construction manager to make changes in the project without invalidating the contract.","path":["NE Code","Chapter 61"],"source_url":"https://nebraskalegislature.gov/laws/statutes.php?statute=61-516","current_through":"2026-08-14","vintage":"open-us-law v2026.08, retrieved 2026-09-14","retrieved_at":"2026-09-14T18:32:21Z","sha256":"d35c6accb94f432b13a41807b0b88ccc01f90957b2c58af545f6338b26bad937","source_id":"us-ne","stale":false,"prev":"us-ne/neb.-rev.-stat.-61-515","next":"us-ne/neb.-rev.-stat.-61-517"},"notice":"GroundRules: Original legal text. Not legal advice."}