{"data":{"id":"us-ne/neb.-rev.-stat.-70-2004","jurisdiction":"us-ne","citation":"Neb. Rev. Stat. § 70-2004","heading":"Neb. Rev. Stat. § 70-2004","body":"(1) A customer-generator shall request an inspection from the State Electrical Division pursuant to subsection (1) of section 81-2124 or subsection (1) of section 81-2125 and shall provide documentation of the completed inspection to the local distribution utility prior to interconnection with the local distribution system.\n\n(2) A customer-generator is responsible for notifying the local distribution utility of its intent to install a qualified facility at least sixty days prior to its installation and is responsible for all costs associated with the qualified facility.\n\n(3) A local distribution utility shall not be required to interconnect with a qualified facility that fails to meet or maintain the local distribution utility's requirements for safety, reliability, and interconnection.\n\n(4) A customer-generator owns the renewable energy credits of the electricity its qualified facility generates.","path":["NE Code","Chapter 70"],"source_url":"https://nebraskalegislature.gov/laws/statutes.php?statute=70-2004","current_through":"2026-08-14","vintage":"open-us-law v2026.08, retrieved 2026-09-14","retrieved_at":"2026-09-14T18:32:21Z","sha256":"f4e3f7a87ebb87f3c8ce8342ecb118e9ea27a47309f879f3b6d88e8ceed5f73b","source_id":"us-ne","stale":false,"prev":"us-ne/neb.-rev.-stat.-70-2003","next":"us-ne/neb.-rev.-stat.-70-2005"},"notice":"GroundRules: Original legal text. Not legal advice."}