{"data":{"id":"us-nh/rsa-234-4","jurisdiction":"us-nh","citation":"RSA 234:4","heading":"Capacity of Bridge.","body":"All bridges constructed with bridge aid funds shall have a carrying capacity of at least the legal load as stipulated in RSA 266. All bridges reconstructed with bridge aid funds shall have a carrying capacity of at least 15 tons.","path":["Title XX: TRANSPORTATION","Chapter 234: BRIDGES AND BRIDGE AID","Duty to Construct and Maintain Bridges"],"source_url":"https://gc.nh.gov/rsa/html/XX/234/234-4.htm","current_through":"2025 regular legislative session, or December 2025","vintage":"","retrieved_at":"2026-09-05T14:29:55Z","sha256":"1a2b9433a0cfab527579d409077a5443e7dc5073e11a865cd694a420908aeb00","source_id":"us-nh","stale":false,"prev":"us-nh/rsa-234-3","next":"us-nh/rsa-234-5"},"notice":"GroundRules: Original legal text. Not legal advice."}
