{"data":{"id":"us-nh/rsa-277-4","jurisdiction":"us-nh","citation":"RSA 277:4","heading":"Weight Requirement.","body":"All scaffolding shall be so constructed as to bear 4 times the maximum weight required to be dependent therefrom or placed thereon when in use.","path":["Title XXIII: LABOR","Chapter 277: SAFETY AND HEALTH OF EMPLOYEES","Building Construction and Repair Work"],"source_url":"https://gc.nh.gov/rsa/html/XXIII/277/277-4.htm","current_through":"2025 regular legislative session, or December 2025","vintage":"","retrieved_at":"2026-09-05T14:42:56Z","sha256":"b99ec505aa78d47ac806531ab1fb7bf4f24644da63fda466e7ef205e332840d4","source_id":"us-nh","stale":false,"prev":"us-nh/rsa-277-3","next":"us-nh/rsa-277-5"},"notice":"GroundRules: Original legal text. Not legal advice."}
