{"data":{"id":"us-nj/n.j.-stat.-32-11d-15","jurisdiction":"us-nj","citation":"N.J. Stat. § 32:11D-15","heading":"Comprehensive plan, program and budgets","body":"The commission shall, in accordance with Article 13 of this compact, formulate and adopt:\n(a) A comprehensive plan, after consultation with water users and interested  public bodies, for the immediate and long range development and uses of the  water resources of the basin;\n(b) A water resources program, based upon the comprehensive plan, which shall include a systematic presentation of the quantity and quality of water resources needs of the area to be served for such reasonably foreseeable period  as the commission may determine, balanced by existing and proposed projects  required to satisfy such needs, including all public and private projects  affecting the basin, together with a separate statement of the projects  proposed to be undertaken by the commission during such period; and\n(c) An annual current expense budget, and an annual capital budget consistent with the water resources program covering the commission's projects and facilities for the budget period.\nL.1961, c. 13, p. 50, s. 3.2.","path":["TITLE 32 INTERSTATE AND PORT AUTHORITIES AND\t\t\t\tCOMMISSIONS"],"source_url":"https://pub.njleg.state.nj.us/statutes/STATUTES-TEXT.zip","current_through":"P.L.2025, c.405, and J.R.22","vintage":"","retrieved_at":"2026-08-27T17:54:13Z","sha256":"35fd037b7a9d0e374733d0c9879af477fe39021d76151b778123d5bb7212be2f","source_id":"us-nj","stale":true,"prev":"us-nj/n.j.-stat.-32-11d-14","next":"us-nj/n.j.-stat.-32-11d-16"},"notice":"GroundRules: Original legal text. Not legal advice."}
