{"data":{"id":"us-nj/n.j.-stat.-48-3-113","jurisdiction":"us-nj","citation":"N.J. Stat. § 48:3-113","heading":"Standby charge.","body":"4. a. Upon request to an electric public utility, electric power supplier, or basic generation service provider for standby power by a facility that supplies power to an end-use customer pursuant to section 3 of P.L.2017, c.357 (C.48:3-112) or the end-use customer of that power, the electric public utility, electric power supplier, or basic generation provider, as applicable, shall impose and assess a standby charge.\nb.\tThe Board of Public Utilities shall, within 120 days after the effective date of P.L.2017, c.357 (C.48:3-110 et seq.), establish criteria for an electric public utility, electric power supplier, or basic generation provider to assess and impose a standby charge.\nL.2017, c.357, s.4.","path":["TITLE 48 PUBLIC UTILITIES"],"source_url":"https://pub.njleg.state.nj.us/statutes/STATUTES-TEXT.zip","current_through":"P.L.2025, c.405, and J.R.22","vintage":"","retrieved_at":"2026-08-27T17:54:13Z","sha256":"e147fcab475ef8be25a92eaf07a230c18b61308ea88796c1b986ba2f9d773153","source_id":"us-nj","stale":true,"prev":"us-nj/n.j.-stat.-48-3-112","next":"us-nj/n.j.-stat.-48-3-114"},"notice":"GroundRules: Original legal text. Not legal advice."}
