{"data":{"id":"us-nj/n.j.-stat.-58-11-9.6","jurisdiction":"us-nj","citation":"N.J. Stat. § 58:11-9.6","heading":"Renewal of permit, prerequisites to","body":"The State department, before it renews any permit, shall be satisfied of the  following facts:\n(a) That the approved physical connection has been tested for tightness under prevailing pressure conditions at least every 3 months;\n(b) That the approved physical connection has been subjected to an internal  inspection within 6 months prior to the application;  and\n(c) That the local board of health, the State department, and the owner of the water supply set forth in section 3 of this act, have determined that the approved physical connection was functioning satisfactorily.\nL.1942, c. 308, p. 1141, s. 6.  Amended by L.1966, c. 47, s. 5, eff. May 24, 1966.","path":["TITLE 58 WATERS AND WATER SUPPLY"],"source_url":"https://pub.njleg.state.nj.us/statutes/STATUTES-TEXT.zip","current_through":"P.L.2025, c.405, and J.R.22","vintage":"","retrieved_at":"2026-08-27T17:54:13Z","sha256":"2855a76a13995b5d8cd5dbd6fc8ddaa097ba807ff8e3d01eeb194b499393594e","source_id":"us-nj","stale":true,"prev":"us-nj/n.j.-stat.-58-11-9.5","next":"us-nj/n.j.-stat.-58-11-9.7"},"notice":"GroundRules: Original legal text. Not legal advice."}
