{"data":{"id":"us-nj/n.j.-stat.-58-21b-1","jurisdiction":"us-nj","citation":"N.J. Stat. § 58:21B-1","heading":"Appropriation;  engineering;  site acquisition","body":"There is hereby appropriated from the Water Conservation Fund to the Department of Environmental Protection the sum of $29 million, or so much thereof as may be necessary, for the development of future water supply facilities to the following extent:\n(a) A sum not to exceed $2 million for the costs of design and engineering for future construction of water supply facilities;\n(b) A sum not to exceed $27 million for the acquisition of real property necessary for the future water supply facilities at the following sites:\nSouth River Tidal Dam, Middlesex county;  Raritan River Confluence Reservoir, Somerset county;  Manasquan River Upper and Lower Reservoirs, Monmouth county;  Six-Mile Run Reservoir, Somerset county;  Two Bridges Reservoir, Essex and Morris counties;  Hackettstown Reservoir, Morris, Sussex and Warren counties.\nL.1970, c. 147, s. 1, eff. July 17, 1970.","path":["TITLE 58 WATERS AND WATER SUPPLY"],"source_url":"https://pub.njleg.state.nj.us/statutes/STATUTES-TEXT.zip","current_through":"P.L.2025, c.405, and J.R.22","vintage":"","retrieved_at":"2026-08-27T17:54:13Z","sha256":"b36136579abe69ba0bc76961d6ad43aa0811376931899671ecb827029eab5243","source_id":"us-nj","stale":true,"prev":"us-nj/n.j.-stat.-58-21-6","next":"us-nj/n.j.-stat.-58-21b-2"},"notice":"GroundRules: Original legal text. Not legal advice."}
