{"data":{"id":"us-nj/n.j.-stat.-58-25-28","jurisdiction":"us-nj","citation":"N.J. Stat. § 58:25-28","heading":"Abatement measures","body":"Within 30 months after enactment of this act, any public entity operating a combined stormwater sewer and sanitary sewage system shall provide abatement measures approved by the department at any combined sewer overflow point for which a permit is required pursuant to P.L. 1977, c. 74 (C. 58:10A-1 et seq.). Any public entity that fails to provide, in accordance with standards established therefor by the department, appropriate abatement measures approved by the department at a combined sewer overflow point after the expiration of the 30 month period shall be subject to the penalty provisions of P.L. 1977, c. 74 (C. 58:10A-1 et seq.), and to any other enforcement action that may be appropriate.     L. 1988, c. 90, s. 6.","path":["TITLE 58 WATERS AND WATER SUPPLY"],"source_url":"https://pub.njleg.state.nj.us/statutes/STATUTES-TEXT.zip","current_through":"P.L.2025, c.405, and J.R.22","vintage":"","retrieved_at":"2026-08-27T17:54:13Z","sha256":"e7978510a3d22552363d90ba40eeba63b7f44e0a21a2f50e360f2ffdd9de9b6d","source_id":"us-nj","stale":true,"prev":"us-nj/n.j.-stat.-58-25-27","next":"us-nj/n.j.-stat.-58-25-29"},"notice":"GroundRules: Original legal text. Not legal advice."}
