{"data":{"id":"us-nm/13-1-122.2","jurisdiction":"us-nm","citation":"13-1-122.2","heading":"Definitions.","body":"As used in the Transportation Construction Manager General Contractor Act:\nA. \"construction manager general contractor\" means a person who, pursuant to a contract with the department, provides preconstruction services, construction management and construction services required for a project;\nB. \"construction manager general contractor delivery method\" means a project delivery method in which a contract for construction manager general contractor services is procured separately from a contract for project design services and a contract for independent cost estimate services;\nC. \"department\" means the department of transportation;\nD. \"guaranteed maximum price\" means the maximum amount to be paid by the department for the construction of the project;\nE. \"preconstruction services\" means consulting services related to construction management and construction provided during the transportation project design stage;\nF. \"project\" means a state public works project for highway construction or reconstruction;\nG. \"project design services\" means engineering services, surveying services or landscape architectural services; and\nH. \"secretary\" means the secretary of transportation.","path":["Chapter 13 - Public Purchases and Property","ARTICLE 1 Procurement"],"source_url":"https://nmonesource.com/nmos/nmsa-unanno/en/item/18513/index.do","current_through":"2026-07-01","vintage":"","retrieved_at":"2026-09-03T15:02:19Z","sha256":"0de32865292256de1194a73e99d0e43929b044bbe51ea5e3a6baa20679a8cfa4","source_id":"us-nm","stale":false,"prev":"us-nm/13-1-122.1","next":"us-nm/13-1-122.3"},"notice":"GroundRules: Original legal text. Not legal advice."}
