{"data":{"id":"us-nm/62-16b-3","jurisdiction":"us-nm","citation":"62-16B-3","heading":"Community solar facility requirements.","body":"A. A community solar facility shall:\n(1) have a nameplate capacity rating of five megawatts alternating current or less;\n(2) be located in the service territory of the qualifying utility and be interconnected to the electric distribution system of that qualifying utility;\n(3) have at least ten subscribers;\n(4) have the option to be co-located with other energy resources, but shall not be co-located with other community solar facilities;\n(5) not allow a single subscriber to be allocated more than forty percent of the generating capacity of the facility; and\n(6) make at least forty percent of the total generating capacity of a community solar facility available in subscriptions of twenty-five kilowatts or less.\nB. The provisions of this section shall not apply to a native community solar project; provided that a native community solar project shall be located in the service territory of a qualifying utility and be interconnected to the electric distribution system of that qualifying utility.","path":["Chapter 62 - Electric, Gas and Water Utilities","ARTICLE 16B Community Solar"],"source_url":"https://nmonesource.com/nmos/nmsa-unanno/en/item/18565/index.do","current_through":"2026-05-20","vintage":"","retrieved_at":"2026-09-03T15:02:20Z","sha256":"b7e6a299eaad34abe0dfd0c0c31c16c04add19b1650364f7fa16fb4dd5d315d9","source_id":"us-nm","stale":false,"prev":"us-nm/62-16b-2","next":"us-nm/62-16b-4"},"notice":"GroundRules: Original legal text. Not legal advice."}
