{"data":{"id":"us-nv/nrs-11.208","jurisdiction":"us-nv","citation":"NRS 11.208","heading":"Action by contractor against Department of Transportation upon contract for construction, reconstruction, improvement or maintenance of highway.","body":"An action by a contractor against the Department of Transportation upon a contract for the construction, reconstruction, improvement or maintenance of a highway must be commenced within 3 years after the date of the:\n1. Completion of the contract; or\n2. Determination of the engineer or decision of the Board of Directors of the Department of Transportation on an appeal of a claim arising from the contract as provided in the standard specifications for construction of roads and bridges adopted by the Department,\nÊ whichever occurs later.","path":["TITLE 2 — CIVIL PRACTICE","CHAPTER 11 - LIMITATION OF ACTIONS","ACTIONS OTHER THAN FOR THE RECOVERY OF REAL PROPERTY"],"source_url":"https://www.leg.state.nv.us/NRS/NRS-011.html#NRS011Sec208","current_through":"2025 session (NRS as revised 2026-08-25)","vintage":"","retrieved_at":"2026-09-03T05:51:30Z","sha256":"87f5b72363fd73ad1854265d24fb8d82b3298d9865527cdab64414c419107fe9","source_id":"us-nv","stale":true,"prev":"us-nv/nrs-11.2075","next":"us-nv/nrs-11.209"},"notice":"GroundRules: Original legal text. Not legal advice."}
