{"data":{"id":"us-nv/nrs-268.684","jurisdiction":"us-nv","citation":"NRS 268.684","heading":"“Electric project” defined.","body":"“Electric project” means facilities pertaining to a municipal electric heat, light and power system for the generation, transportation and distribution of electrical energy, including without limitation ponds, lakes, dams, spillways, reservoirs, towers, generators, pumping plants, power plants, pumping stations, gauging stations, conduits, transmission lines, engines, boilers, pumps, meters, poles, resistors, transformers, apparatus, tools, equipment, fixtures, structures, buildings and other electric energy generation, transmission and distribution facilities (or any combination thereof).","path":["TITLE 21 — CITIES AND TOWNS","CHAPTER 268 - POWERS AND DUTIES COMMON TO CITIES AND TOWNS INCORPORATED UNDER GENERAL OR SPECIAL LAWS","CITY BOND LAW"],"source_url":"https://www.leg.state.nv.us/NRS/NRS-268.html#NRS268Sec684","current_through":"2025 session (NRS as revised 2026-08-25)","vintage":"","retrieved_at":"2026-09-03T05:51:35Z","sha256":"b851dfdcbaaf4d6b42e179ef7c92d63f81a5e0ed63eae380dfead3df7400f7e0","source_id":"us-nv","stale":true,"prev":"us-nv/nrs-268.682","next":"us-nv/nrs-268.686"},"notice":"GroundRules: Original legal text. Not legal advice."}
