{"data":{"id":"us-nv/nrs-278.0195","jurisdiction":"us-nv","citation":"NRS 278.0195","heading":"“Utility project” defined.","body":"“Utility project” means:\n1. An electric transmission line which is designed to operate at 200 kilovolts or more; or\n2. A line used to transport natural gas which operates at 20 percent or more of the specified minimum yield strength of the material from which the line is constructed,\nÊ which has been approved for construction after October 1, 1991, by the State or Federal Government or a governing body.","path":["TITLE 22 — COOPERATIVE AGREEMENTS BY PUBLIC AGENCIES; REGIONAL TRANSPORTATION COMMISSIONS; PLANNING AND ZONING; DEVELOPMENT AND REDEVELOPMENT","CHAPTER 278 - PLANNING AND ZONING","GENERAL PROVISIONS"],"source_url":"https://www.leg.state.nv.us/NRS/NRS-278.html#NRS278Sec0195","current_through":"2025 session (NRS as revised 2026-08-25)","vintage":"","retrieved_at":"2026-09-03T05:51:36Z","sha256":"24757bba1f93cb836df114043f5450a7228e7356f5933ad540ebb57c526afac4","source_id":"us-nv","stale":true,"prev":"us-nv/nrs-278.0193","next":"us-nv/nrs-278.020"},"notice":"GroundRules: Original legal text. Not legal advice."}
