{"data":{"id":"us-nv/nrs-278.376","jurisdiction":"us-nv","citation":"NRS 278.376","heading":"Certificate by county or city surveyor or by county or city engineer.","body":"1. A final map presented for filing must include a certificate by the county surveyor or county engineer if a subdivision lies within an unincorporated area, and if a subdivision lies within a city, a certificate by the city surveyor, city engineer or county surveyor when for that purpose appointed by the governing body of the city, stating:\n(a) That he or she has examined the final map; and\n(b) That the map is technically correct and that if the monuments have not been set, that a proper performance bond has been deposited guaranteeing their setting on or before a day certain.\n2. The person certifying the information required by this section must be licensed as a professional land surveyor or civil engineer pursuant to chapter 625 of NRS.","path":["TITLE 22 — COOPERATIVE AGREEMENTS BY PUBLIC AGENCIES; REGIONAL TRANSPORTATION COMMISSIONS; PLANNING AND ZONING; DEVELOPMENT AND REDEVELOPMENT","CHAPTER 278 - PLANNING AND ZONING","DIVISIONS OF LAND","Subdivision of Land: Final Maps"],"source_url":"https://www.leg.state.nv.us/NRS/NRS-278.html#NRS278Sec376","current_through":"2025 session (NRS as revised 2026-08-25)","vintage":"","retrieved_at":"2026-09-03T05:51:36Z","sha256":"ebc15d4db77b5de71dbcc3d0c3565cd5b52ea8334898af83ea2f8451f02ab1e1","source_id":"us-nv","stale":true,"prev":"us-nv/nrs-278.375","next":"us-nv/nrs-278.3765"},"notice":"GroundRules: Original legal text. Not legal advice."}
