{"data":{"id":"us-nv/nrs-338.1575","jurisdiction":"us-nv","citation":"NRS 338.1575","heading":"Submission by contractor of list of subcontractors; prohibitions.","body":"1. Before a public body issues a job order, a contractor must submit a list of each subcontractor whom the contractor intends to engage for work on the job order.\n2. A contractor shall not:\n(a) Perform any work required by a job order unless the requirements of subsection 1 are met.\n(b) Substitute a subcontractor for any subcontractor who is named in the list provided pursuant to subsection 1 unless the requirements prescribed by subsection 5 of NRS 338.141 are met.","path":["TITLE 28 — PUBLIC WORKS AND PLANNING","CHAPTER 338 - PUBLIC WORKS","JOB ORDER CONTRACTS"],"source_url":"https://www.leg.state.nv.us/NRS/NRS-338.html#NRS338Sec1575","current_through":"2025 session (NRS as revised 2026-08-25)","vintage":"","retrieved_at":"2026-09-03T05:51:37Z","sha256":"927e080da0e09fee8657755824678769722275deb239fc8531c7897cb203a7c6","source_id":"us-nv","stale":true,"prev":"us-nv/nrs-338.1574","next":"us-nv/nrs-338.1576"},"notice":"GroundRules: Original legal text. Not legal advice."}
