{"data":{"id":"us-nv/nrs-338.169","jurisdiction":"us-nv","citation":"NRS 338.169","heading":"Public body authorized to construct public work by selecting and entering into contracts with construction manager at risk; limitations.","body":"1. Subject to the provisions of subsection 2, a public body may construct a public work by:\n(a) Selecting a construction manager at risk pursuant to the provisions of NRS 338.1691 to 338.1696, inclusive; and\n(b) Entering into separate contracts with a construction manager at risk:\n(1) For preconstruction services, including, without limitation:\n(I) Assisting the public body in determining whether scheduling or constructability problems exist that would delay the construction of the public work;\n(II) Estimating the cost of the labor and material for the public work; and\n(III) Assisting the public body in determining whether the public work can be constructed within the public body’s budget; and\n(2) To construct the public work.\n2. A public body in a county whose population is less than 100,000 may enter into contracts with a construction manager at risk pursuant to NRS 338.1685 to 338.16995, inclusive, for the construction of not more than two public works in a calendar year that are discrete projects.","path":["TITLE 28 — PUBLIC WORKS AND PLANNING","CHAPTER 338 - PUBLIC WORKS","CONTRACTS INVOLVING CONSTRUCTION MANAGERS AT RISK"],"source_url":"https://www.leg.state.nv.us/NRS/NRS-338.html#NRS338Sec169","current_through":"2025 session (NRS as revised 2026-08-25)","vintage":"","retrieved_at":"2026-09-03T05:51:37Z","sha256":"db30870561707f9133a786fb875eb72e4dca9a6f579bace00e851c3df0d6f665","source_id":"us-nv","stale":true,"prev":"us-nv/nrs-338.1685","next":"us-nv/nrs-338.1691"},"notice":"GroundRules: Original legal text. Not legal advice."}
