{"data":{"id":"us-nv/nrs-338.1697","jurisdiction":"us-nv","citation":"NRS 338.1697","heading":"Authorized provision in contract with construction manager at risk for construction of public work or portion thereof for guaranteed maximum price.","body":"A contract entered into pursuant to NRS 338.1696 that is for a guaranteed maximum price may include a provision that authorizes the construction manager at risk to receive all or part of any difference between the guaranteed maximum price set forth in the contract and the actual price of construction of the public work, if the actual price is less than the guaranteed maximum price.","path":["TITLE 28 — PUBLIC WORKS AND PLANNING","CHAPTER 338 - PUBLIC WORKS","CONTRACTS INVOLVING CONSTRUCTION MANAGERS AT RISK"],"source_url":"https://www.leg.state.nv.us/NRS/NRS-338.html#NRS338Sec1697","current_through":"2025 session (NRS as revised 2026-08-25)","vintage":"","retrieved_at":"2026-09-03T05:51:37Z","sha256":"9e2c62cadb24487bff1fd2366d2fa94fec776d1b0124a60051ba5ac4d6d4833a","source_id":"us-nv","stale":true,"prev":"us-nv/nrs-338.1696","next":"us-nv/nrs-338.1698"},"notice":"GroundRules: Original legal text. Not legal advice."}
