{"data":{"id":"us-nv/nrs-349.937","jurisdiction":"us-nv","citation":"NRS 349.937","heading":"“Cost of a water project” defined.","body":"“Cost of a water project” means all or a designated part of the cost of any water project, including any incidental cost pertaining to the water project. The cost of a water project may include, among other costs, the costs of:\n1. Surveys, audits, preliminary plans, other plans, specifications, estimates and other costs of preparations;\n2. Appraising, printing, estimating, advice, services of engineers, architects, financial consultants, attorneys, clerical personnel and other agents and employees;\n3. Publishing, posting, mailing and otherwise giving notice, filing or recording instruments, taking options and fees to banks;\n4. Establishment of a reserve for contingencies;\n5. Interest on bonds for any time which does not exceed the estimated period of construction plus 1 year, discounts on bonds, reserves for the payment of the principal of and interest on bonds, replacement expenses and other costs of issuing bonds;\n6. Amending any resolution or other instrument authorizing the issuance of, or otherwise relating to, bonds for the water project; and\n7. Short-term financing,\nÊ and the expense of operation and maintenance of the water project.","path":["TITLE 30 — PUBLIC BORROWING AND OBLIGATIONS","CHAPTER 349 - STATE OBLIGATIONS","FINANCING OF WATER PROJECTS"],"source_url":"https://www.leg.state.nv.us/NRS/NRS-349.html#NRS349Sec937","current_through":"2025 session (NRS as revised 2026-08-25)","vintage":"","retrieved_at":"2026-09-03T05:51:37Z","sha256":"cef6208ffc020c31cea0516d62c2dd37bc4485575044df6ed9c020f2b8f3c402","source_id":"us-nv","stale":true,"prev":"us-nv/nrs-349.936","next":"us-nv/nrs-349.938"},"notice":"GroundRules: Original legal text. Not legal advice."}
