{"data":{"id":"us-nv/nrs-408.3882","jurisdiction":"us-nv","citation":"NRS 408.3882","heading":"Procedure for selecting design-build team.","body":"If the Department desires to contract with a design-build team pursuant to NRS 408.388 and 408.3881, the Department must select the design-build team in accordance with NRS 408.3883 to 408.3886, inclusive.","path":["TITLE 35—HIGHWAYS; ROADS; BRIDGES; PARKS; OUTDOOR RECREATION","CHAPTER 408 - HIGHWAYS, ROADS AND TRANSPORTATION FACILITIES","CONSTRUCTION, IMPROVEMENT AND MAINTENANCE OF HIGHWAYS","Design-Build Contracts"],"source_url":"https://www.leg.state.nv.us/NRS/NRS-408.html#NRS408Sec3882","current_through":"2025 session (NRS as revised 2026-08-25)","vintage":"","retrieved_at":"2026-09-03T05:51:39Z","sha256":"5efb1451b653520cc4173d901b44d12389aa563789bc730f7c04a33bc49d63d2","source_id":"us-nv","stale":true,"prev":"us-nv/nrs-408.3881","next":"us-nv/nrs-408.3883"},"notice":"GroundRules: Original legal text. Not legal advice."}
