{"data":{"id":"us-nv/nrs-408.55079","jurisdiction":"us-nv","citation":"NRS 408.55079","heading":"Failure of qualified borrower to remit full amount due: Notice; withholding of money allotted or appropriated to borrower; exceptions.","body":"[Replaced in revision by NRS 226.808.]","path":["TITLE 35—HIGHWAYS; ROADS; BRIDGES; PARKS; OUTDOOR RECREATION","CHAPTER 408 - HIGHWAYS, ROADS AND TRANSPORTATION FACILITIES","NEVADA STATE INFRASTRUCTURE BANK"],"source_url":"https://www.leg.state.nv.us/NRS/NRS-408.html#NRS408Sec55079","current_through":"2025 session (NRS as revised 2026-08-25)","vintage":"","retrieved_at":"2026-09-03T05:51:39Z","sha256":"c5c70c0d062803d12c1b510783541c945fa6ce801e315cac174b340436d7247d","source_id":"us-nv","stale":true,"prev":"us-nv/nrs-408.55078","next":"us-nv/nrs-408.55081"},"notice":"GroundRules: Original legal text. Not legal advice."}
