{"data":{"id":"us-nv/nrs-528.0554","jurisdiction":"us-nv","citation":"NRS 528.0554","heading":"Control of erosion: Use of slash to retard water flow.","body":"Wherever terrain or any other factor precludes proper diversion of water flow from skid trails as required by NRS 528.0551 and 528.0552, slash shall be scattered on such skid trails in sufficient quantity to retard water flow thereon and hold erosion to a minimum.","path":["TITLE 47 — FORESTRY; FOREST PRODUCTS AND FLORA","CHAPTER 528 - FOREST PRACTICE AND REVEGETATION","FOREST PRACTICE"],"source_url":"https://www.leg.state.nv.us/NRS/NRS-528.html#NRS528Sec0554","current_through":"2025 session (NRS as revised 2026-08-25)","vintage":"","retrieved_at":"2026-09-03T05:51:42Z","sha256":"8c5e94e3e5a24f4f7218c24b6ce74263bb993a7d5c7cd3bbeb2cfecd28f251a8","source_id":"us-nv","stale":true,"prev":"us-nv/nrs-528.0553","next":"us-nv/nrs-528.057"},"notice":"GroundRules: Original legal text. Not legal advice."}
