{"data":{"id":"us-nv/nrs-543.547","jurisdiction":"us-nv","citation":"NRS 543.547","heading":"Compliance with master plan required for construction of flood control facility by local government; state agencies required to comply with master plan if practicable.","body":"1. Flood control facilities constructed by local governments must be constructed in compliance with the master plan. Local governments may request an amendment to the master plan pursuant to NRS 543.597.\n2. State agencies shall consider the master plan when planning and designing their flood control facilities. Whenever practicable, state agencies shall comply with the master plan.","path":["TITLE 48 — WATER","CHAPTER 543 - CONTROL OF FLOODS","DISTRICTS FOR CONTROL OF FLOODS","Board of Directors: Powers and Duties"],"source_url":"https://www.leg.state.nv.us/NRS/NRS-543.html#NRS543Sec547","current_through":"2025 session (NRS as revised 2026-08-25)","vintage":"","retrieved_at":"2026-09-03T05:51:42Z","sha256":"e6d8b7357e0c208d762973c387df16378f4c0cf899252e0cc002da7af4aa97f5","source_id":"us-nv","stale":true,"prev":"us-nv/nrs-543.545","next":"us-nv/nrs-543.550"},"notice":"GroundRules: Original legal text. Not legal advice."}
