{"data":{"id":"us-nv/nrs-543.596","jurisdiction":"us-nv","citation":"NRS 543.596","heading":"Further review of master plan at 5-year intervals.","body":"The review of the master plan conducted every 5 years, in addition to considering the information required in subsection 1 of NRS 543.5955, must:\n1. Add to the plan any new information which is relevant to the plan; and\n2. Assess the progress toward fulfillment of the master plan during the 5-year period, identify any major obstacles to completion of the master plan and recommend amendments to the master plan resulting from growth and development in the district.","path":["TITLE 48 — WATER","CHAPTER 543 - CONTROL OF FLOODS","DISTRICTS FOR CONTROL OF FLOODS","Board of Directors: Powers and Duties"],"source_url":"https://www.leg.state.nv.us/NRS/NRS-543.html#NRS543Sec596","current_through":"2025 session (NRS as revised 2026-08-25)","vintage":"","retrieved_at":"2026-09-03T05:51:42Z","sha256":"3bd307440a5a0d8a841e90aad990a12601d2287ad2f0682aa93c2beccc2f0009","source_id":"us-nv","stale":true,"prev":"us-nv/nrs-543.5955","next":"us-nv/nrs-543.5965"},"notice":"GroundRules: Original legal text. Not legal advice."}
