{"data":{"id":"us-nv/nrs-624.890","jurisdiction":"us-nv","citation":"NRS 624.890","heading":"Contractor who commits certain violations may be required to obtain services of construction control.","body":"1. If a contractor who performs work concerning a residential photovoltaic system used to produce electricity is determined by the Board to have violated:\n(a) One or more of the provisions of NRS 624.301 to 624.305, inclusive, 624.860, 624.870 or 624.875; or\n(b) Any regulation adopted by the Board with respect to contracts for work concerning a residential photovoltaic system used to produce electricity,\nÊ the Board may require that the contractor obtain the services of a construction control for each contract that the contractor enters into for work concerning a residential photovoltaic system used to produce electricity.\n2. The contractor may not:\n(a) Be related to the construction control or to an employee or agent of the construction control; or\n(b) Hold, directly or indirectly, a financial interest in the business of the construction control.\n3. As used in this section, “construction control” has the meaning ascribed to it in NRS 627.050.","path":["TITLE 54 — PROFESSIONS, OCCUPATIONS AND BUSINESSES","CHAPTER 624 - CONTRACTORS","RESIDENTIAL PHOTOVOLTAIC SYSTEMS USED TO PRODUCE ELECTRICITY"],"source_url":"https://www.leg.state.nv.us/NRS/NRS-624.html#NRS624Sec890","current_through":"2025 session (NRS as revised 2026-08-25)","vintage":"","retrieved_at":"2026-09-03T05:51:44Z","sha256":"8c8205b80ec48ceed7668e2fa8b100d36d553700aa4ed8e4608d92dd4e2823af","source_id":"us-nv","stale":true,"prev":"us-nv/nrs-624.885","next":"us-nv/nrs-624.895"},"notice":"GroundRules: Original legal text. Not legal advice."}
