{"data":{"id":"us-nv/nrs-704.754","jurisdiction":"us-nv","citation":"NRS 704.754","heading":"Reports regarding transmission plan.","body":"On or before February 15 of each odd-numbered year, the Commission shall review, approve and submit to the Director of the Legislative Counsel Bureau for transmittal to the next regular session of the Legislature a written report compiling all information about any transmission plan proposed by, adopted by or made known to the Commission since the last report.","path":["TITLE 58 — ENERGY; PUBLIC UTILITIES AND SIMILAR ENTITIES","CHAPTER 704 - REGULATION OF PUBLIC UTILITIES GENERALLY","ELECTRIC SERVICE","Disposal of Generation Assets"],"source_url":"https://www.leg.state.nv.us/NRS/NRS-704.html#NRS704Sec754","current_through":"2025 session (NRS as revised 2026-08-25)","vintage":"","retrieved_at":"2026-09-03T05:51:47Z","sha256":"96607e6579fec5ab2a5c07163e461d8bb0a711ac3bbc760452e9134dd1c75432","source_id":"us-nv","stale":true,"prev":"us-nv/nrs-704.753","next":"us-nv/nrs-704.7561"},"notice":"GroundRules: Original legal text. Not legal advice."}
