{"data":{"id":"us-nv/nrs-704.7595","jurisdiction":"us-nv","citation":"NRS 704.7595","heading":"Effect of violation.","body":"If an electric utility disposes of a generation asset in violation of NRS 704.7561 to 704.7595, inclusive, the disposal is void and unenforceable and is not valid for any purpose.","path":["TITLE 58 — ENERGY; PUBLIC UTILITIES AND SIMILAR ENTITIES","CHAPTER 704 - REGULATION OF PUBLIC UTILITIES GENERALLY","ELECTRIC SERVICE","Alternative Rate-Making Plans"],"source_url":"https://www.leg.state.nv.us/NRS/NRS-704.html#NRS704Sec7595","current_through":"2025 session (NRS as revised 2026-08-25)","vintage":"","retrieved_at":"2026-09-03T05:51:47Z","sha256":"5e6facd784e212d02521cb55c5cdb1292432dff2131a92e6368ce5d7e954a0fe","source_id":"us-nv","stale":true,"prev":"us-nv/nrs-704.7591","next":"us-nv/nrs-704.761"},"notice":"GroundRules: Original legal text. Not legal advice."}
