{"data":{"id":"us-nv/nrs-704.7745","jurisdiction":"us-nv","citation":"NRS 704.7745","heading":"Final inspection by utility; temporary disconnection and reconnection of electric service relating to installation.","body":"1. If a customer-generator has received all the necessary inspections from any governmental entity required for the installation of a net metering system and submits to a utility a request for the completion of a final inspection by the utility, the utility shall complete the final inspection within a reasonable time after receipt of the request in accordance with the regulations adopted pursuant to NRS 704.773.\n2. If a customer-generator submits to a utility a request to temporarily disconnect and subsequently reconnect electric service in relation to the installation of a net metering system, the utility shall schedule the temporary disconnection and subsequent reconnection within a reasonable time after receiving the request in accordance with the regulations adopted pursuant to NRS 704.773.","path":["TITLE 58 — ENERGY; PUBLIC UTILITIES AND SIMILAR ENTITIES","CHAPTER 704 - REGULATION OF PUBLIC UTILITIES GENERALLY","ELECTRIC SERVICE","Net Metering Systems"],"source_url":"https://www.leg.state.nv.us/NRS/NRS-704.html#NRS704Sec7745","current_through":"2025 session (NRS as revised 2026-08-25)","vintage":"","retrieved_at":"2026-09-03T05:51:47Z","sha256":"6d985e3fa5820dbca1e712924cbf01a1f3cdb9c04aae69a2b7210fcb09e51a68","source_id":"us-nv","stale":true,"prev":"us-nv/nrs-704.774","next":"us-nv/nrs-704.775"},"notice":"GroundRules: Original legal text. Not legal advice."}
