{"data":{"id":"us-nv/nrs-704.7988","jurisdiction":"us-nv","citation":"NRS 704.7988","heading":"Modifications recommended by the Commission; actions by utility.","body":"If the Commission deems inadequate any portion of a transmission infrastructure for a clean energy economy plan or any amendment to the plan, the Commission, as provided in NRS 704.751, may recommend to the electric utility a modification of that portion of the plan or amendment, and the electric utility may:\n1. Accept the modification; or\n2. Withdraw the proposed plan or amendment.","path":["TITLE 58 — ENERGY; PUBLIC UTILITIES AND SIMILAR ENTITIES","CHAPTER 704 - REGULATION OF PUBLIC UTILITIES GENERALLY","ELECTRIC SERVICE","Regional Transmission Coordination"],"source_url":"https://www.leg.state.nv.us/NRS/NRS-704.html#NRS704Sec7988","current_through":"2025 session (NRS as revised 2026-08-25)","vintage":"","retrieved_at":"2026-09-03T05:51:47Z","sha256":"e0e20e67e3564d5a26e90ddd6a25f58016951a9992e6e0375d001e66791ccde3","source_id":"us-nv","stale":true,"prev":"us-nv/nrs-704.79879","next":"us-nv/nrs-704.79881"},"notice":"GroundRules: Original legal text. Not legal advice."}
