{"data":{"id":"us-nv/nrs-704.840","jurisdiction":"us-nv","citation":"NRS 704.840","heading":"“Commence to construct” defined.","body":"“Commence to construct” means any clearing of land, excavation or other action which would adversely affect the natural environment of the site or route of a utility facility, but does not include changes needed for temporary use of sites or routes for nonutility purposes, or uses in securing geological data, including necessary borings to ascertain foundation conditions.","path":["TITLE 58 — ENERGY; PUBLIC UTILITIES AND SIMILAR ENTITIES","CHAPTER 704 - REGULATION OF PUBLIC UTILITIES GENERALLY","CONSTRUCTION OF UTILITY FACILITIES: UTILITY ENVIRONMENTAL PROTECTION ACT"],"source_url":"https://www.leg.state.nv.us/NRS/NRS-704.html#NRS704Sec840","current_through":"2025 session (NRS as revised 2026-08-25)","vintage":"","retrieved_at":"2026-09-03T05:51:47Z","sha256":"0e5cdd0847e41db09ad252571c6c390310a8f04ede1f06a1e15bbdc2860c7873","source_id":"us-nv","stale":true,"prev":"us-nv/nrs-704.834","next":"us-nv/nrs-704.842"},"notice":"GroundRules: Original legal text. Not legal advice."}
