{"data":{"id":"us-nv/nrs-704.891","jurisdiction":"us-nv","citation":"NRS 704.891","heading":"Reports to be filed with Commission by person holding permit who is not public utility.","body":"1. Any person other than a public utility who receives a permit issued by the Commission pursuant to NRS 704.820 to 704.900, inclusive, shall, as provided in subsection 2, file with the Commission reports which contain:\n(a) The location, nature and capacity of that facility;\n(b) The anticipated date for commercial operation of that facility;\n(c) Information regarding whether any public utility in this state has contracted for the purchase of the capacity or other services of that facility; and\n(d) Information regarding whether any capacity or other services of that facility is available for purchase by public utilities in this state.\n2. The reports required by subsection 1 must be filed:\n(a) On or before the date on which construction of a utility facility is commenced; and\n(b) On a date not later than:\n(1) Twelve months before the scheduled date of commercial operation of that facility; or\n(2) Thirty days before the actual date of commercial operation of that facility,\nÊ whichever is earlier.","path":["TITLE 58 — ENERGY; PUBLIC UTILITIES AND SIMILAR ENTITIES","CHAPTER 704 - REGULATION OF PUBLIC UTILITIES GENERALLY","CONSTRUCTION OF UTILITY FACILITIES: UTILITY ENVIRONMENTAL PROTECTION ACT"],"source_url":"https://www.leg.state.nv.us/NRS/NRS-704.html#NRS704Sec891","current_through":"2025 session (NRS as revised 2026-08-25)","vintage":"","retrieved_at":"2026-09-03T05:51:47Z","sha256":"2c6458e3a930a67d112b9b56f20d558f52bbd8ee418e9fc39f889ff29a4d8f8d","source_id":"us-nv","stale":true,"prev":"us-nv/nrs-704.8905","next":"us-nv/nrs-704.893"},"notice":"GroundRules: Original legal text. Not legal advice."}
