{"data":{"id":"us-nv/nrs-704.99059","jurisdiction":"us-nv","citation":"NRS 704.99059","heading":"Significant operational or capital requirements” defined.","body":"“Significant operational or capital requirements” means the construction of a new transmission, distribution, compression or storage facility or the rehabilitation, replacement, modification, upgrade, uprate or update of existing facilities, or any planned series of such activities addressing the same need, in which the anticipated cost exceeds the threshold established by the Commission pursuant to subsection 3 of NRS 704.991.","path":["TITLE 58 — ENERGY; PUBLIC UTILITIES AND SIMILAR ENTITIES","CHAPTER 704 - REGULATION OF PUBLIC UTILITIES GENERALLY","NATURAL GAS SERVICE","Resource Planning and Programs of Economic Development"],"source_url":"https://www.leg.state.nv.us/NRS/NRS-704.html#NRS704Sec99059","current_through":"2025 session (NRS as revised 2026-08-25)","vintage":"","retrieved_at":"2026-09-03T05:51:47Z","sha256":"da62568802f879409dcd01ae67062bc206f464fefbf87485ccb9a1a57b8f9e14","source_id":"us-nv","stale":true,"prev":"us-nv/nrs-704.99058","next":"us-nv/nrs-704.991"},"notice":"GroundRules: Original legal text. Not legal advice."}
