{"data":{"id":"us-ny/n.y.-environmental-conservation-law-57-0207","jurisdiction":"us-ny","citation":"N.Y. Environmental Conservation Law § 57-0207","heading":"Plan adoption","body":"§ 57-0207. Plan adoption.\n  1. After completion of a draft plan consistent with the requirements\nof section 57-0205 of this title, the town board shall hold a public\nhearing on said draft plan upon not less than ten days notice to the\npublic. Notice shall be provided in the same manner as for the adoption\nof a local law.\n  2. The town board shall receive and review all comments on the draft\nplan before final adoption.\n  3. The town board shall adopt the final plan by resolution.","path":["Environmental Conservation Law","Article 57. Long Island Pine Barrens Maritime Reserve Act","Title 2. Peconic Bay Region Watershed Protection Act"],"source_url":"https://legislation.nysenate.gov/api/3/laws/ENV/57-0207","current_through":"2026-09-11","vintage":"","retrieved_at":"2026-09-14T19:32:44Z","sha256":"cd5f06126ac4abfdf7543a151c0b3acbd8af3268102c8809fe010623420f92d3","source_id":"us-ny","stale":false,"prev":"us-ny/n.y.-environmental-conservation-law-57-0205","next":"us-ny/n.y.-environmental-conservation-law-57-0209"},"notice":"GroundRules: Original legal text. Not legal advice."}
