{"data":{"id":"us-ny/n.y.-general-construction-law-53","jurisdiction":"us-ny","citation":"N.Y. General Construction Law § 53","heading":"Time, use of standard","body":"§ 53. Time, use of standard. Any act required by or in pursuance of\nlaw to be performed at or within a prescribed time, shall be performed\naccording to the standard time.","path":["General Construction Law","Article 2. Meaning of Terms"],"source_url":"https://legislation.nysenate.gov/api/3/laws/GCN/53","current_through":"2026-09-11","vintage":"","retrieved_at":"2026-09-14T19:32:44Z","sha256":"8fcc81c6d080beab968c12ef907607e5ad446d447961e00edfb40ad65b62dce9","source_id":"us-ny","stale":false,"prev":"us-ny/n.y.-general-construction-law-52","next":"us-ny/n.y.-general-construction-law-53-a"},"notice":"GroundRules: Original legal text. Not legal advice."}
