{"data":{"id":"us-nyc/n.y.c.-admin.-code-225.11","jurisdiction":"us-nyc","citation":"N.Y.C. Admin. Code § 225.11","heading":"Section 225.11","body":"Section 225.11 – Revise Section 225.11 to read as follows:\n\n225.11 Overhead Branch Circuits Attached to Buildings or Structures. Overhead branch circuits and feeders attached to buildings or structures shall be installed in accordance with the requirements of 230.54.\n\nInformational Note: Refer to Part II of Article 225 for underground installation.","path":["New York City Administrative Code","Title 28","Chapter 11: The New York City Electrical Code"],"source_url":"https://files.amlegal.com/pdffiles/NewYorkCity/Admin/XML.zip","current_through":"Local Law 2026/135 (enacted August 31, 2026)","vintage":"","retrieved_at":"2026-09-06T02:48:57Z","sha256":"f516b8829db40c4074bd2e88e35c85e1b6bc2f4ab6e1a49a78d615900fe5cb2d","source_id":"us-nyc","stale":false,"prev":"us-nyc/n.y.c.-admin.-code-220.87","next":"us-nyc/n.y.c.-admin.-code-225.30"},"notice":"GroundRules: Original legal text. Not legal advice."}
