{"data":{"id":"us-nyc/n.y.c.-admin.-code-27-105","jurisdiction":"us-nyc","citation":"N.Y.C. Admin. Code § 27-105","heading":"§ 27-105 Effective date.","body":"Any work for which an application for a permit was submitted to the department prior to the effective date of this code, (December sixth nineteen hundred sixty-eight), or for which an application for a permit is submitted to the department within a period of twelve months after such date may, however, at the option of the owner, be performed in its entirety in accordance with the requirements of this code, or in accordance with the requirements of the building laws and regulations previously in force in the city of New York, provided that such work is commenced within twelve months after the date of issuance of a permit therefor and is diligently carried on to completion. This section shall not apply to the requirements of article ten of subchapter nineteen of this chapter which shall become effective on December sixth, nineteen hundred sixty-eight.","path":["New York City Administrative Code","Title 27","Chapter 1: Building Code"],"source_url":"https://files.amlegal.com/pdffiles/NewYorkCity/Admin/XML.zip","current_through":"Local Law 2026/135 (enacted August 31, 2026)","vintage":"","retrieved_at":"2026-09-06T02:48:57Z","sha256":"1ed90c15d9cda1d8b262afe75e1d70d8c6b17d927029d43a6617c0432ef47bc4","source_id":"us-nyc","stale":false,"prev":"us-nyc/n.y.c.-admin.-code-27-104","next":"us-nyc/n.y.c.-admin.-code-27-106"},"notice":"GroundRules: Original legal text. Not legal advice."}
