{"data":{"id":"us-nyc/n.y.c.-admin.-code-27-909","jurisdiction":"us-nyc","citation":"N.Y.C. Admin. Code § 27-909","heading":"§ 27-909 Permits.","body":"In addition to the permits required under provisions of subchapter one of this chapter, the following permits shall also be required.\n\n(a) Permits for the installation of the building house sewer from the street line to, and including, the spur connection at the street sewer shall be obtained from the department of environmental protection, except that, in conjunction with the issuance of a permit for the construction or alteration of a structure within the curbline, the commissioner may issue a permit for connection with a sewer or drain.\n\n(b) Permits for sidewalk and street openings shall be obtained from the department of transportation.","path":["New York City Administrative Code","Title 27","Chapter 1: Building Code"],"source_url":"https://files.amlegal.com/pdffiles/NewYorkCity/Admin/XML.zip","current_through":"Local Law 2026/135 (enacted August 31, 2026)","vintage":"","retrieved_at":"2026-09-06T02:48:57Z","sha256":"b5ab5db9231cb53f270499fd38630e4751714203049087774616e86fd900a1db","source_id":"us-nyc","stale":false,"prev":"us-nyc/n.y.c.-admin.-code-27-908","next":"us-nyc/n.y.c.-admin.-code-27-910"},"notice":"GroundRules: Original legal text. Not legal advice."}
