{"data":{"id":"us-nyc/n.y.c.-admin.-code-28-104.2.2","jurisdiction":"us-nyc","citation":"N.Y.C. Admin. Code § 28-104.2.2","heading":"§ 28-104.2.2 Approval or acceptance to be indicated on construction documents.","body":"All construction documents, when approved, shall be stamped or endorsed \"approved\" under the official method of the department, followed by a notation of the date except that construction documents accepted with less than full examination by the department shall be stamped or endorsed \"accepted\" instead of \"approved\".","path":["New York City Administrative Code","Title 28","Chapter 1: Administration"],"source_url":"https://files.amlegal.com/pdffiles/NewYorkCity/Admin/XML.zip","current_through":"Local Law 2026/135 (enacted August 31, 2026)","vintage":"","retrieved_at":"2026-09-06T02:48:57Z","sha256":"b1778d2b3a19d09be1107d5e6d9e3a417e545704c24812cab4fd645669156823","source_id":"us-nyc","stale":false,"prev":"us-nyc/n.y.c.-admin.-code-28-104.2.1.6","next":"us-nyc/n.y.c.-admin.-code-28-104.2.3"},"notice":"GroundRules: Original legal text. Not legal advice."}
