{"data":{"id":"us-nyc/n.y.c.-admin.-code-28-105.1.2","jurisdiction":"us-nyc","citation":"N.Y.C. Admin. Code § 28-105.1.2","heading":"§ 28-105.1.2 Projects for which a stormwater construction permit is required.","body":"It shall be a violation of this code to engage in any development activity with respect to a covered development project without a stormwater construction permit issued by the department of environmental protection. The issuance of a permit pursuant to this code shall not be construed to be permission for any activity that requires a stormwater construction permit issued by the department of environmental protection pursuant to chapter 5-A of title 24 of the administrative code. The issuance of a stormwater construction permit by the department of environmental protection shall not be construed as permission for work that requires a permit from the department of buildings pursuant to this code.\n\n(L.L. 2017/097, 5/30/2017, eff. 6/1/2019; Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022)","path":["New York City Administrative Code","Title 28","Chapter 1: Administration"],"source_url":"https://files.amlegal.com/pdffiles/NewYorkCity/Admin/XML.zip","current_through":"Local Law 2026/135 (enacted August 31, 2026)","vintage":"","retrieved_at":"2026-09-06T02:48:57Z","sha256":"6f5e205a1a1d0a307c7999add2ce911059ce6649470e187308dae3c3e26861b3","source_id":"us-nyc","stale":false,"prev":"us-nyc/n.y.c.-admin.-code-28-105.1.1","next":"us-nyc/n.y.c.-admin.-code-28-105.1.3"},"notice":"GroundRules: Original legal text. Not legal advice."}
