{"data":{"id":"us-nyc/n.y.c.-admin.-code-28-105.2.1","jurisdiction":"us-nyc","citation":"N.Y.C. Admin. Code § 28-105.2.1","heading":"§ 28-105.2.1 Submittal documents required for foundations and earthwork.","body":"Prior to the issuance of any permit for work that includes foundations and/or earthwork, submittal documents clearly illustrating support of excavation design, including but not limited to stepping, sheeting, sloping, shoring, and bracing, and any protective railings or equipment required by chapter 33 of the New York city building code shall be required.","path":["New York City Administrative Code","Title 28","Chapter 1: Administration"],"source_url":"https://files.amlegal.com/pdffiles/NewYorkCity/Admin/XML.zip","current_through":"Local Law 2026/135 (enacted August 31, 2026)","vintage":"","retrieved_at":"2026-09-06T02:48:57Z","sha256":"e780e4a50e041278d25f7fee9dcad2ec1b0505e85b9a749c2c567cfa18ab310e","source_id":"us-nyc","stale":false,"prev":"us-nyc/n.y.c.-admin.-code-28-105.2","next":"us-nyc/n.y.c.-admin.-code-28-105.2.2"},"notice":"GroundRules: Original legal text. Not legal advice."}
