{"data":{"id":"us-nyc/n.y.c.-admin.-code-28-110.2","jurisdiction":"us-nyc","citation":"N.Y.C. Admin. Code § 28-110.2","heading":"§ 28-110.2 Phased site safety plans.","body":"Multiple layouts of the site safety features enumerated in section 28-110.1 may be submitted at any time during construction operations to show phased site safety designs consistent with the phase of anticipated work.","path":["New York City Administrative Code","Title 28","Chapter 1: Administration"],"source_url":"https://files.amlegal.com/pdffiles/NewYorkCity/Admin/XML.zip","current_through":"Local Law 2026/135 (enacted August 31, 2026)","vintage":"","retrieved_at":"2026-09-06T02:48:57Z","sha256":"0d57e188601eb0e6d119106b0f54f8ff4e8068ab936654bd82b9b79a2d220ed9","source_id":"us-nyc","stale":false,"prev":"us-nyc/n.y.c.-admin.-code-28-110.1","next":"us-nyc/n.y.c.-admin.-code-28-111.1"},"notice":"GroundRules: Original legal text. Not legal advice."}
