{"data":{"id":"us-nyc/n.y.c.-admin.-code-28-116.1.1","jurisdiction":"us-nyc","citation":"N.Y.C. Admin. Code § 28-116.1.1","heading":"§ 28-116.1.1 Defective work and discrepancies with approved construction documents.","body":"An approved agency conducting inspections shall report defective work and discrepancies with the approved construction documents to the contractor and, when applicable, to the superintendent of construction, for correction. The approved agency shall report uncorrected discrepancies and defective work to the registered design professional of record and the owner in writing.","path":["New York City Administrative Code","Title 28","Chapter 1: Administration"],"source_url":"https://files.amlegal.com/pdffiles/NewYorkCity/Admin/XML.zip","current_through":"Local Law 2026/135 (enacted August 31, 2026)","vintage":"","retrieved_at":"2026-09-06T02:48:57Z","sha256":"16a4930f9f6f6b973182788ef890415560db53d6e3f165928211ad15358c9d02","source_id":"us-nyc","stale":false,"prev":"us-nyc/n.y.c.-admin.-code-28-116.1","next":"us-nyc/n.y.c.-admin.-code-28-116.1.2"},"notice":"GroundRules: Original legal text. Not legal advice."}
