{"data":{"id":"us-nyc/n.y.c.-admin.-code-28-117.1.2","jurisdiction":"us-nyc","citation":"N.Y.C. Admin. Code § 28-117.1.2","heading":"§ 28-117.1.2 New certificate required.","body":"The following changes to a place of assembly shall require a new place of assembly certificate of operation instead of an amendment filed in accordance with section 28-117.1.3:\n\n1. For a department issued place of assembly permit or place of assembly certificate of operation that does not have a nine-digit job number, any change of zoning use group, assembly occupancy group A-1 through A-5, or any of the changes set forth in section 28-117.1.3.\n\n2. For all other department issued place of assembly permits or place of assembly certificates of operation, any change of zoning use group or assembly occupancy group A-1 through A-5.","path":["New York City Administrative Code","Title 28","Chapter 1: Administration"],"source_url":"https://files.amlegal.com/pdffiles/NewYorkCity/Admin/XML.zip","current_through":"Local Law 2026/135 (enacted August 31, 2026)","vintage":"","retrieved_at":"2026-09-06T02:48:57Z","sha256":"a92c0e5c9a752189e594c30b71977ab9101d280a08852dcaabc3de2449af1084","source_id":"us-nyc","stale":false,"prev":"us-nyc/n.y.c.-admin.-code-28-117.1.1","next":"us-nyc/n.y.c.-admin.-code-28-117.1.3"},"notice":"GroundRules: Original legal text. Not legal advice."}
