{"data":{"id":"us-nyc/n.y.c.-admin.-code-28-118.15.1","jurisdiction":"us-nyc","citation":"N.Y.C. Admin. Code § 28-118.15.1","heading":"§ 28-118.15.1 Interim certificate of occupancy.","body":"An interim certificate of occupancy may be issued authorizing occupancy of a specific floor or floors of a building prior to the completion of the entire work covered by a permit in accordance with this section and rules of the department, subject to the following conditions:\n\n1. The building is of noncombustible construction and protected with an automatic sprinkler system;\n\n2. Adequate means of egress are provided;\n\n3. There are no outstanding objections relating to or affecting the occupancy of such portion of the building; and\n\n4. Upon inspection, the portion of the building is deemed safe for occupancy without reliance upon temporary measures.\n\nExceptions: Section 28-118.15.1 shall not apply to:\n\n1. Residential buildings with fewer than eight stories or fewer than four dwelling units; or\n\n2. Nonresidential buildings with fewer than five stories; or\n\n3. Mixed-use buildings with fewer than four dwelling units; or\n\n4. Parking structures.\n\n(L.L. 2021/006, 1/10/2021, eff. 5/10/2021; Am. L.L. 2023/077, 6/11/2023, eff. 6/11/2023)","path":["New York City Administrative Code","Title 28","Chapter 1: Administration"],"source_url":"https://files.amlegal.com/pdffiles/NewYorkCity/Admin/XML.zip","current_through":"Local Law 2026/135 (enacted August 31, 2026)","vintage":"","retrieved_at":"2026-09-06T02:48:57Z","sha256":"5ce8c6a3c1ed318cca661f22ee52d34cc08fc57b4d31894dee7d7e3fd95b2e49","source_id":"us-nyc","stale":false,"prev":"us-nyc/n.y.c.-admin.-code-28-118.15","next":"us-nyc/n.y.c.-admin.-code-28-118.15.1.1"},"notice":"GroundRules: Original legal text. Not legal advice."}
