{"data":{"id":"us-nyc/n.y.c.-admin.-code-28-119.1.1","jurisdiction":"us-nyc","citation":"N.Y.C. Admin. Code § 28-119.1.1","heading":"§ 28-119.1.1 Gas shut-off for alterations to gas piping systems.","body":"When alterations, extensions or repairs to existing gas meter piping or gas distribution piping require the shut-off of gas flow to a building, the utility company shall be notified by the owner or the owner's authorized representative.","path":["New York City Administrative Code","Title 28","Chapter 1: Administration"],"source_url":"https://files.amlegal.com/pdffiles/NewYorkCity/Admin/XML.zip","current_through":"Local Law 2026/135 (enacted August 31, 2026)","vintage":"","retrieved_at":"2026-09-06T02:48:57Z","sha256":"862584aaff9daec350405d8b3f95b8b21d803580bc5f3e21a431d867c3573a80","source_id":"us-nyc","stale":false,"prev":"us-nyc/n.y.c.-admin.-code-28-119.1","next":"us-nyc/n.y.c.-admin.-code-28-119.2"},"notice":"GroundRules: Original legal text. Not legal advice."}
