{"data":{"id":"us-nyc/n.y.c.-admin.-code-28-315.8.3","jurisdiction":"us-nyc","citation":"N.Y.C. Admin. Code § 28-315.8.3","heading":"§ 28-315.8.3 Connections for temporary external boilers and chillers.","body":"For buildings whose main use or dominant occupancy is group I-2 hospital and that are located in a flood hazard area, as such term is defined in appendix G of the New York city building code, the provision of connections for temporary external boilers and chillers in accordance with the retroactive requirements of section G312.3 of appendix G of the New York city building code shall be completed by January 1, 2033, and a report detailing compliance with such requirements shall be filed with the department in accordance with section G312.3.2 of such appendix by such date.","path":["New York City Administrative Code","Title 28","Chapter 3: Maintenance of Buildings"],"source_url":"https://files.amlegal.com/pdffiles/NewYorkCity/Admin/XML.zip","current_through":"Local Law 2026/135 (enacted August 31, 2026)","vintage":"","retrieved_at":"2026-09-06T02:48:57Z","sha256":"91ce729e58466a3c0d65254388c5b2cbf77ebd55bedd256022a3ddebf7610b6f","source_id":"us-nyc","stale":false,"prev":"us-nyc/n.y.c.-admin.-code-28-315.8.2.1","next":"us-nyc/n.y.c.-admin.-code-28-315.8.3.1"},"notice":"GroundRules: Original legal text. Not legal advice."}
