{"data":{"id":"us-nyc/n.y.c.-admin.-code-28-318.3","jurisdiction":"us-nyc","citation":"N.Y.C. Admin. Code § 28-318.3","heading":"§ 28-318.3 Inspection process.","body":"Gas piping systems shall be inspected and tested in accordance with sections 28-318.3.1 through 28-318.3.4.\n\n(L.L. 2016/152, 12/6/2016, eff. 12/6/2016)","path":["New York City Administrative Code","Title 28","Chapter 3: Maintenance of Buildings"],"source_url":"https://files.amlegal.com/pdffiles/NewYorkCity/Admin/XML.zip","current_through":"Local Law 2026/135 (enacted August 31, 2026)","vintage":"","retrieved_at":"2026-09-06T02:48:57Z","sha256":"d8769ea3b77b92366bf8acb123672b68bba63256d63183c4ba954ed76e8f4258","source_id":"us-nyc","stale":false,"prev":"us-nyc/n.y.c.-admin.-code-28-318.2","next":"us-nyc/n.y.c.-admin.-code-28-318.3.1"},"notice":"GroundRules: Original legal text. Not legal advice."}
