{"data":{"id":"us-nyc/n.y.c.-admin.-code-28-322.3","jurisdiction":"us-nyc","citation":"N.Y.C. Admin. Code § 28-322.3","heading":"§ 28-322.3 Locking before hurricane or strong wind conditions.","body":"If a hurricane or strong wind conditions are expected, the commissioner may order that large turbines equipped with passive locks be stopped and locked.\n\n(L.L. 2019/098, 5/19/2019, eff. 11/15/2019; Am. L.L. 2019/147, 7/27/2019, eff. 11/15/2019)","path":["New York City Administrative Code","Title 28","Chapter 3: Maintenance of Buildings"],"source_url":"https://files.amlegal.com/pdffiles/NewYorkCity/Admin/XML.zip","current_through":"Local Law 2026/135 (enacted August 31, 2026)","vintage":"","retrieved_at":"2026-09-06T02:48:57Z","sha256":"775bb773f1b048e40219c814560d4a9fcb7a47cd0d690a1652f0e47f546b11ae","source_id":"us-nyc","stale":false,"prev":"us-nyc/n.y.c.-admin.-code-28-322.2","next":"us-nyc/n.y.c.-admin.-code-28-322.4"},"notice":"GroundRules: Original legal text. Not legal advice."}
