{"data":{"id":"us-nyc/n.y.c.-admin.-code-28-324.1.2","jurisdiction":"us-nyc","citation":"N.Y.C. Admin. Code § 28-324.1.2","heading":"§ 28-324.1.2 Covered dry floodproofing systems.","body":"Covered dry floodproofing systems include any dry floodproofing system where human intervention is required to implement any measure, including the installation of shields, equipment, temporary stairs and platforms, hardware, signage, fixed flood-resistant glazing systems or similar components necessary to activate and implement the dry floodproofing system.\n\n(L.L. 2021/126, 11/7/2021, eff. 11/7/2022)","path":["New York City Administrative Code","Title 28","Chapter 3: Maintenance of Buildings"],"source_url":"https://files.amlegal.com/pdffiles/NewYorkCity/Admin/XML.zip","current_through":"Local Law 2026/135 (enacted August 31, 2026)","vintage":"","retrieved_at":"2026-09-06T02:48:57Z","sha256":"6d15887aa7267cf3d6b60905ce105ad1192786f63d7946ee8928ef2d714a4a01","source_id":"us-nyc","stale":false,"prev":"us-nyc/n.y.c.-admin.-code-28-324.1.1","next":"us-nyc/n.y.c.-admin.-code-28-324.2"},"notice":"GroundRules: Original legal text. Not legal advice."}
