{"data":{"id":"us-nyc/n.y.c.-admin.-code-590.1","jurisdiction":"us-nyc","citation":"N.Y.C. Admin. Code § 590.1","heading":"Section 590.1","body":"Section 590.1 – Add new Informational Notes Nos. 1 and 2 at the end of Section 590.1 to read as follows:\n\nInformational Note No. 1: See Chapter 1 of Title 28 of the Administrative Code for retroactive requirements of Section 28-315.8.2 as it pertains to “Connections for Temporary External Generators.”\n\nInformational Note No. 2: See Section G304.5 of Appendix G of the New York City Building Code for additional construction standards with respect to temporary external generator connections in areas of special flood hazard.","path":["New York City Administrative Code","Title 28","Chapter 11: The New York City Electrical Code"],"source_url":"https://files.amlegal.com/pdffiles/NewYorkCity/Admin/XML.zip","current_through":"Local Law 2026/135 (enacted August 31, 2026)","vintage":"","retrieved_at":"2026-09-06T02:48:57Z","sha256":"4382abed13338c57f14166e89e813ad8fb287068987f73354c426d6765117634","source_id":"us-nyc","stale":false,"prev":"us-nyc/n.y.c.-admin.-code-552.48","next":"us-nyc/n.y.c.-admin.-code-590.9"},"notice":"GroundRules: Original legal text. Not legal advice."}
